Rotating shift generator

DuPont Shift Schedule: 12-Hour Rotating Calendar

A 28-day rotation of 12-hour days and nights, ending every cycle with a full 7 days off.

Cycle28 days (4 weeks)
Crews4
Shift length12 hours
Best for24/7 continuous operations that value a long recovery break — refineries, chemical plants, power stations
Day 7a–7pNight 7p–7aOff
90 work days87 days off44 day46 night1080 hours

September 2026

MonTueWedThuFriSatSun
12345Night6Night
7Night8Night9101112Day13Day
14Day1516Night17Night18Night1920
2122Day23Day24Day25Day2627
282930

October 2026

MonTueWedThuFriSatSun
123Night4Night
5Night6Night78910Day11Day
12Day1314Night15Night16Night1718
1920Day21Day22Day23Day2425
262728293031Night

November 2026

MonTueWedThuFriSatSun
1Night
2Night3Night4567Day8Day
9Day1011Night12Night13Night1415
1617Day18Day19Day20Day2122
232425262728Night29Night
30Night

December 2026

MonTueWedThuFriSatSun
1Night2345Day6Day
7Day89Night10Night11Night1213
1415Day16Day17Day18Day1920
212223242526Night27Night
28Night29Night3031

January 2027

MonTueWedThuFriSatSun
12Day3Day
4Day56Night7Night8Night910
1112Day13Day14Day15Day1617
181920212223Night24Night
25Night26Night27282930Day31Day

February 2027

MonTueWedThuFriSatSun
1Day23Night4Night5Night67
89Day10Day11Day12Day1314
151617181920Night21Night
22Night23Night24252627Day28Day

How the DuPont schedule works

The DuPont schedule runs a 28-day cycle: 4 night shifts, 3 off, 3 day shifts, 1 off, 3 nights, 3 off, 4 days, then a full 7 days off. Each crew both works days and nights within the cycle, and four crews offset by a week keep the plant covered 24/7. Over the 28 days each crew works 14 twelve-hour shifts — 42 hours a week on average — and the standout feature is the whole week off at the end of every rotation.

Pros

  • A full 7 days off every cycle
  • Balanced mix of day and night shifts
  • Continuous 24/7 cover with four crews
  • Averages 42 hours a week

Cons

  • A run of 4 nights then 3 days is hard on the body clock
  • Rotating day/night is more disruptive than fixed shifts
  • Long cycle is harder to memorise

Who uses the DuPont pattern

A classic in chemical and petrochemical plants (it originated at DuPont), oil refineries, power generation, and other continuous-process manufacturing.

Plan the DuPont cycle around its long recovery block

The seven-day break is the visible attraction of a DuPont rotation, but it should not be treated as spare capacity. Review the complete 28 days, including the four-night and four-day runs, before scheduling training, overtime, or maintenance. A task that appears easy to place in one week can collide with the next crew transition when you look at the whole cycle.

DuPont moves each crew from nights to days within one cycle, so the handover standard must be explicit. Record what must be transferred, where it is recorded, when it is reviewed, and who owns an unresolved issue. Build in any overlap required by the operation rather than relying on two 12-hour shifts ending and starting at the same minute.

Use a published crew reference date and label changes separately from the base pattern. If holiday cover, leave, or a shutdown requires an exception, show the exception and who approved it. This preserves a readable repeating structure for employees while giving the manager an auditable source of truth.

  • The full 28-day cycle has been checked for roles, leave, and known events.
  • Day-to-night and night-to-day handovers have a written operating process.
  • Training and maintenance are planned against the full cycle, not only the seven-day break.
  • Changes are visible exceptions with a date and approver.

Pattern comparison

If you are deciding between nearby options, compare the weekly hours, longest work run, and biggest off block before you standardise the rota.

Pattern Avg hours / week Longest work run Longest off block Fatigue load
DuPont 42 4 days 7 days Medium
2-2-3 42 3 days 3 days Medium
4-on-4-off 42 4 days 4 days Medium
7 On 7 Off 42 7 days 7 days High

A shorter longest work run usually feels safer and easier to recover from. A longer off block is better for commute-heavy or remote teams, but often comes with a tougher on block just before it.

Frequently asked questions

How long is the DuPont cycle?

It is a 4-week (28-day) cycle. Each crew works 14 twelve-hour shifts over those 28 days, averaging 42 hours a week.

Why is the DuPont schedule popular?

The seven consecutive days off at the end of every cycle is the big draw — few 24/7 patterns give a full week off that often.

Does each crew work both days and nights?

Yes. Unlike 2-2-3, a DuPont crew rotates through both night and day blocks within the same 28-day cycle.